Accelerated Building Construction

Change the method.
Advance the schedule.

ABC is BK Contractors' approach to solving schedule and constructability problems by moving work away from congested final locations, fabricating assemblies in controlled conditions, and using cranes and planned logistics to install larger completed components.

Why ABC

We don't just ask how to build it.
We ask where and when it should be built.

Traditional construction often divides work by trade and completes each activity sequentially in its final location. That can create congestion, repeated access, work-at-height exposure and schedule dependency. ABC looks at the whole installation and restructures the sequence around the project constraint.

01

Preplanning

Break the scope into assemblies, lifts and installation zones before crews reach the critical workface.

02

Fabrication

Build modules off-site or at ground level where access, quality control and productivity can be improved.

03

Crane Logistics

Plan rigging, picks, staging and installation so completed assemblies move efficiently into final position.

04

Cross-Trade Solutions

Coordinate interfaces that cross traditional trade lines instead of allowing scope boundaries to dictate the construction method.

05

Parallel Work

Fabrication can proceed while demolition, preparation or other critical-path activities continue elsewhere.

06

Field Installation

Convert repetitive field construction into planned installation events with defined crews, equipment and durations.

The Process

Preplan. Fabricate. Lift. Install.

01 / ANALYZE

Find the constraint

Schedule, access, height, congestion, shutdown windows or sequencing.

02 / REENGINEER

Change the sequence

Determine what can be modularized, prefabricated or completed in parallel.

03 / PREBUILD

Move work

Shift labour to a safer, more productive fabrication area whenever practical.

04 / INSTALL

Execute the lift

Use planned crane and field operations to rapidly place and complete the assembly.

ABC is a project-delivery mindset, not a single construction system.The exact approach is developed around the engineering, site conditions, crane capacity, temporary works, safety requirements and project schedule for each scope.
Where It Creates Value

Complex scopes are where unconventional thinking pays.

ABC is particularly useful where conventional sequencing creates too much work at height, too many mobilizations, limited access, long shutdowns or excessive dependency between trades.

Potential applications

Roof replacement modules • structural framing assemblies • high-rise edge systems • temporary works • repetitive assemblies • shutdown work • structural repair packages • crane-assisted demolition and replacement

Bring us the constraint.

Tell us what is slowing the project down. BK Contractors will review the scope and look for a safer, faster or more buildable path forward.